About permission for occupancy of roads, roadwork enforcement application for approval

The last update date:

◆About permission for occupancy of roads, roadwork enforcement application for approval

 

■ About permission for occupancy of roads application

  Summary of 1 permission for occupancy of roads

   As road is facility for car and walker to pass safely, other than road manager has setting of structure except road installations in road area  

  We are not recognized as rukotoha, principle.

   When it is necessary to do use of o with road floor (private use) out of necessity, for construction of building of land (private land) adjacent to road, we receive permission of road manager  

  There is ru need.

  2 application methods

   Please submit the following documents to the following department in charge (group).

  (1) Two copies of permission for occupancy of roads applications (as for the copy, possible with copy) 

 ・Position figure (as for the maps of ZENRIN. We displayed private use point with red.)

 ・Figure of present situation (ground plan, cross section)

 ・Illustrated map (ground plan, cross section.in total We displayed private use part with red.)

 ・The present situation photograph

 ・Figure of character, matter to be registered certificate (as needed)

 ・In addition, (documents may be necessary for others depending on item.)

  Procedure that is necessary before 3 application, permission

   When authorization of other laws and ordinances except road law is necessary, on permission for occupancy of roads application, it is necessary to have you receive those authorization beforehand.

  Procedure that is necessary after 4 permission

   (1) Submission of report of start of construction

 Please submit no later than three days before you start roadwork accompanied with road private use. 

 

■ About roadwork enforcement application for approval (road law Article 24 enforcement approval) 

  Summary of 1 roadwork enforcement approval

       (1) Target act

           Need to receive approval of road manager beforehand when we need construction of the following roads for setting of access route to site of house and store 

         But, there is.

            ・Devaluation of sidewalk

     ・Curbstone block, removal, transference of planting zone

     ・Road law landfill with floor

  (2) Main condition of approval

     ・As there is limit, please consult about area of frontage of access route beforehand.

   ※Standard of frontage → General house ... 4m, general store ... 6m

  ・When we fill up road law o with floor, it is necessary to establish gutter for rainwater drainage with burden on applicant.

 2 application methods

  (1) Two copies of roadwork enforcement written applications for approval (as for the copy, possible with copy)

     Roadwork enforcement written application for approval (PDF: 111.7 kilobytes) We open with the other window   Roadwork enforcement written application for approval (word: 46 kilobytes) We open with the other window

  (2) Two copies of attachment (as for the copy, possible with copy)

    ・Written oath

   Written oath (PDF: 51.1 kilobytes)We open with the other window written oath (word: 30.5 kilobytes) We open with the other window

 ・Position figure (as for the maps of ZENRIN. We displayed construction point with red.)

 ・Figure of present situation (ground plan, cross section)

 ・Illustrated map (ground plan, cross section.in total We displayed road area part with red.) 

 ・The present situation photograph

 ・Figure of character, matter to be registered certificate (as needed)

 ・In addition, (documents may be necessary for others depending on item.)

 Procedure that is necessary before 3 application, approval

   When we are roadwork enforcement application for approval, and authorization of other laws and ordinances except road law is necessary, there is need to have you receive those authorization beforehand

 masu.

 Procedure that is necessary after 4 approval

  (1) Submission of report of start of construction

Please submit no later than three days before you start roadwork. 

  (2) Submission of report of completion

After the completion, please submit immediately.

 

★Contact information

 Aso Area Promotion Bureau Department of Civil Engineering maintenance Coordination Division management general affairs group

 〒869-2612 2402, Ichinomiyamachimiyaji, Aso-shi

 Telephone: 0967-22-1118

 FAX: 0967-22-4370

 E-mail: [email protected]

 

 

 

(ID: 25098)
※When PDF file is attached as materials, Adobe Acrobat(R) is necessary.
When you look at PDF documents, Adobe Reader is necessary. When you are not displayed definitely, please use the latest version.
Kumamoto prefectural government office   〒 862-8570  6-18-1, Suizenji, Chuo-ku, Kumamoto-shi, Kumamoto Tel: 096-383-1111 (main)
Copyright(C) 2015 Kumamoto Prefectural Government. All rights reserved.