Summary of building environment consideration system

The last update date:
Department of Civil Engineering Architecture Division 
TEL: 096-333-2533 
FAX: 096-384-9820 
Email [email protected]

■About basic constitution of system

  In building environment consideration system, we plan approach promotion of prevention of global warming by two next basic matters.

  1.  (1) Making, submissions such as plans pertaining to environmental consideration of building
  2.  (2) Public announcements such as submitted plans 
 

■With plan

  Plans are books which specified the following matters.
  1.   1. Environmental consideration measures that are effective for discharge reduction of greenhouse gas
  2.   2. Evaluation result of environmental consideration measures to carry out (we did)
       ※Building environment, evaluation tool which energy-saving system (the authorization association of MLIT) developed uses (CASBEE).
  3.   3. Introduction examination result of use of renewable energy facilities

■The point of system introduction

  • By demanding making, submission of plan for new construction, extension and/or alteration uniformity size that it is thought that influence on global warming is big or more, to building master of, owner, designer, builder for environment consideration of building advance by approach of environment consideration of building by letting interest, and planning improvement of environmental awareness, and plan the spread of high buildings of environmental performance.
  • By public announcement of environmental performance of building, it promotes improvement of environmental awareness of the master of building and approach of voluntary environment consideration through social evaluation and plans the further spread of high buildings of environmental performance.
  • We raise interest in environment consideration of building even if it faces each other other than the person concerned of building publicized by public announcement of environmental performance of building and breed improvement of environmental awareness and promote approach for further environment consideration.
  • We plan the further spread of high buildings of environmental performance by by making submission systems such as any plans, the master of building, owner, designer, builder with interest pushing forward further approach of environment consideration of building for environmental consideration of building.

■About system eligible people (submission division such as plans)

  System object of building environment consideration system,

   (1) Building acts (new construction, extension and/or alteration) constant size (2,000 square meters of deferred floor space) or more
   (2) (1)Building act (new construction, extension and/or alteration, repair) of igai
      (※ single-family house house assumes only new construction, extension and/or alteration for the time being, and repair is inapplicable.)
   (3) Existing building (there are no scale requirements)
      (※ single-family house house is inapplicable for the time being.)

  They are separated of this by three division, and plans making and the submission division are as follows. (we refer to figure)

   (1)Making, submission of "building environment consideration plan" are necessary for building act of this.
   (2)We can perform making, submission of "building environment consideration plan" for option for building act of this.
   (3)We can perform making, submission of "building environmental performance notification form" for option about existing building of this.

Submission division

■About procedure for system

Flow of procedure

 [building environment consideration plan] ((1), (2))       [building environmental performance notification form] ((3))

Plan procedure  Notification form procedure

We revised << content at submission documents and submission time.

 [building environment consideration plan] Connection (building acts such as new construction, extension and/or alteration, repair apply)

 << at the time of original plan >> (within 21 days before construction start, please submit two copies of principals and vice to the following submissions.)

  ◆1 building environment consideration plan (model style)

  ◆2 evaluation results

      In the case of CASBEE Kumamoto

      ※Performance indication sheet, evaluation result sheet, score sheet, consideration matter sheet, emphasis evaluation score sheet
        You print this, and please attach.

      In the case of Kumamoto evaluation tool

      ※Evaluation result sheet, consideration matter sheet

        You print this, and please attach.

  ◆Confirmation result with 3 design specifications confirmation support tools
      ※You print confirmation list sheet, and please attach.

  ◆4-related book (it establishes in manual separately.)

  ◆5 electronic data (Excel file)
      ※Please attach electronic data of evaluation result with evaluation tool, confirmation result with design specifications confirmation support tool in total.

      (in the case of evaluation by CASBEE Kumamoto, please attach confirmation result with design specifications confirmation support tool in total.)

 << at the time of plan change >> (within 15 days before construction start due date pertaining to change, please submit two copies of principals and vice to the following submissions.)

  ◆1 building environment consideration change plan (model style)

  ◆2 evaluation results

      In the case of CASBEE Kumamoto
      ※Performance indication sheet, evaluation result sheet, score sheet, consideration matter sheet, emphasis evaluation score sheet
        You print this, and please attach.

      In the case of Kumamoto evaluation tool

      ※Evaluation result sheet, consideration matter sheet

        You print this, and please attach.

  ◆Confirmation result with 3 design specifications confirmation support tools
      ※You print confirmation list sheet, and please attach.
  ◆4-related book (it affects contents for change.)

  ◆5 electronic data (Excel file)
      ※Please attach electronic data of evaluation result with evaluation tool, confirmation result with design specifications confirmation support tool.

      (in the case of evaluation by CASBEE Kumamoto, please attach confirmation result with design specifications confirmation support tool in total.)

 << at the time of construction completion >> (within 15 days after construction completion, please submit the following submissions earlier.)

  ◆ Building construction completion notification form (model style) 

 ※Please refer to "page of various styles" for style of submission documents.

 [building environmental performance notification form] Connection (existing building applies)

  ◆It is arbitrary at 1 building environmental performance notification form (model style) << submission time. Please submit two copies of principals and vice to the following submissions; >>.

  ◆2 evaluation results

     ・CASBEE Kumamoto
      ※Performance indication sheet, evaluation result sheet, score sheet, consideration matter sheet, emphasis evaluation score sheet
        You print this, and please attach.
      ※Please attach electronic data (Excel file) of evaluation result by CASBEE Kumamoto.

  ◆3 design specifications confirmation support tools
      ※You print confirmation list sheet, and please attach.

  ◆4-related book (it establishes in manual separately.)

  ◆5 electronic data (Excel file)
      ※Please attach electronic data of evaluation result by CASBEE Kumamoto, confirmation result with design specifications confirmation support tool.

   ※Please refer to "page of various styles" for style of submission documents.

Submission

  Submissions such as plans becomes as follows depending on the construction place/location of building.

  [the construction place/location]

  • The ⇒ Kumamoto-shi city construction station Building Guidance Division in Kumamoto-shi
  • ⇒ Yatsushiro-shi Construction Department Building Guidance Division in Yatsushiro-shi
  • ⇒ Amakusa-shi Construction Department Architecture Division (it became addition newly from H24.4.1.) in Amakusa-shi
  • Other than above ⇒ prefecture Department of Civil Engineering Architecture Division (changed from H27.4.1.)

We relate to this page
Inquiry

Department of Civil Engineering Architecture Division security promotion group
Telephone: 096-333-2535
(ID: 1622)
※When PDF file is attached as materials, Adobe Acrobat(R) is necessary.
When you look at PDF documents, Adobe Reader is necessary. When you are not displayed definitely, please use the latest version.
Kumamoto prefectural government office   〒 862-8570  6-18-1, Suizenji, Chuo-ku, Kumamoto-shi, Kumamoto Tel: 096-383-1111 (main)
Copyright(C) 2015 Kumamoto Prefectural Government. All rights reserved.