Building summary

Kikuchi-shi center city area is town with close scale which former cityscape remains. It does well after the war as hot spring sightseeing spot, and hot spring is important resource now with waterway around town. We made point of walker network which by maintaining there some parks, surrounded machinakao on foot and were going to bring about flow of new people. We established hydrophilic function using hot spring and waterway water in two parks which we maintained each and planned so that it was got close as place of interchange, stay of people who visited.

Kiriake Park is located in the place becoming entrance of town. Water collected in the ground which became hollow with nature and established three shallow basins which it was easy to get close to in water and hot spring which drew enacted lake and pond into motif from waterway. In addition, we located public toilet and bench which we assembled on iron plate on the pavement that hardened white stone (we look like stone and rock) to cause a person's movement.

 

Kiriake night

We placed alley park as daily park for inhabitants to be in residential area. Under the theme of a person's flow and interchange, "bank" which we bend pipe and piled up forms footbath, public toilet bench. Bank becomes guide of a person's movement and activity and describes design such as whirlpool in the whole site. In addition, we planted tree with a few crabs which were town, and green remained in impression in conjunction with pavement that hardened green stone.

 

Alley night

It plans to be able to rotate on foot round and round and is doing the park to connect the movement to surround which park momachinakao on foot.

 

Building data

○Kiriake
Name Kiriake pocket park
furiganakiriakepokettopaku
Location 495-1, Waifu, Kikuchi-shi, Kumamoto
Main use parks
Business-centered Kikuchi-shi
Designer Takao Shiotsuka atelier
Builder seven castle construction
Plottage 273. 59 square meters
Building area 14. 10 square meters
Deferred floor space 24. 36 square meters
Number of floors the first floor of the ground
Structure steel-frame building
Outside finish steel galvanizing + phosphoric acid treatment
Construction period from November, 2011 to March, 2012
Total construction cost 32 1 million yen
 
○Alley
Name alley pocket park
furiganayokomachipokettopaku
Location 167-17, Waifu, Kikuchi-shi, Kumamoto
Main use parks
Business-centered Kikuchi-shi
Designer Takao Shiotsuka atelier
Builder Toyosumi construction
Plottage 265. 85 square meters
Building area 15. 28 square meters
Deferred floor space 24. 67 square meters
Number of floors the first floor of the ground
Structure steel-frame building
Outside finish steel galvanizing + phosphoric acid treatment 
Construction period from November, 2011 to March, 2012
Total construction cost 31 1 million yen
 
 

Architect profile

Takao Shiotsuka (shiotsukatakao)
Takao Shiotsuka
It was born in Fukuoka for 1,965 years
We are a graduate from Oita University department of engineering construction engineering department for 1,988 years
1990 Oita University graduate school master's course completion
Authorized architect office Takao Shiotsuka atelier establishment first class for 1,994 years
1999 company Takao Shiotsuka atelier representative director
2002 through 2011 Oita University department of engineering part-time teacher
2004 through 2008 Kyushu University art department of engineering part-time teacher
2012 - Oita University department of engineering welfare environmental engineering department architecture course guest professor
 
●Main work, receiving a prize
2001 2001 good design prize (what not to see feels Kunimi)
Prize for 2002 JCD design 2002
     Prize for encouragement (bus terminal of Onocho)
2004 Architectural Institute of Japan work selection (guest house of inlet)
2007 seventh JIA Kumamoto house prize (house of castle town)
Prize for 2008 thirteenth Kumamoto art police promotion (house of castle town)
2009 DETAIL, PRIZE2009 (Germany) grand prix finalist
      (SILENT HOUSE) JCD design Award 2009
      Silver medal (PLATFORM01, 02)
2012 Architectural Institute of Japan work selection (SILENT HOUSE)
      The Japan Institute of Architects excellence architecture choice 2011 (SILENT HOUSE)
 

Construction looks on-site

March, 2012 (Heisei 24)

From April 2, 2012 (Heisei 24), it is finally beginning to use.

 

[Kiriake]

State of KiriakeState of Kiriake

Shelter and restroom of footbath produced in steel frame factory were carried in the spot and finished installation of facilities apparatus and finish of floor and were finally completed.

After having enjoyed the town of Kikuchi of cherry blossoms full bloom, would you like to spend time relaxedly in footbath?

 

[alley]

State of alleyState of alley

Alley finishes planting, too and is completion.

Hometown said when it might become perfect place to look at skyrocket of Kikuchi autumn festival common usage. We hide and may be spotted.

 

 ○March 25, 2012 (Heisei 24)

[Kiriake]

Footbath, basin masonryThe public toilet inside
We put stone of basin, and shelter of footbath customs shed is the final stage, too.We seem to perform interior construction of public toilet.

 

[alley]

The bank assembling situationThe bank assembling situation

It is the situation assembling bank where benches are attached to.

 

 ○March 22, 2012 (Heisei 24)

[Kiriake]

Steel frame assembling of restroomThe situation that we hang, and public toilet includes

Bounds of public toilet arrive at the spot.

We make thing which was half processed in factory one on the site.

 

Basin construction

We go to ishi* rio of floor becoming basin.

[alley]

The pavement situationThe pavement situation

We are performing osmotic paving work.

 

○March 13, 2012 (Heisei 24)

[Kiriake]

Examination for steel frame factory
Part which becomes shelter of footbath customs shed. We inspected in steel frame factory.

 

 ○March 12, 2012 (Heisei 24)

[Kiriake]

State of Kiriake

Pillar and stairs of bench were attached to basin which became footbath.

 

Finish plating phosphoric acid treatment, and there be customs shed which finished inspection in steel frame factory and appears in the spot.

State of alleyState of alley

Roof of footbath

Restroom

 

 ○March 6, 2012 (Heisei 24)

[Kiriake]

State of alley

We are examining signature. We use letter together with pictogram at first sight to be plain.

 

[alley]

State of alley

There was hole where eddy-formed bank entered.

 

 

February, 2012 (Heisei 24)

○February 21, 2012 (Heisei 24) 

[alley]

Inspection in steel frame factory was conducted.

Lower photograph is part becoming public toilet. Two pieces of bent big iron plates are welded smoothly. (part which color of wall surface is changed to weld)

Public toiletPublic toilet

 

Lower photograph is customs shed of footbath.

FootbathFootbath

We will give zinc molten plating in future and, with customs shed of restroom, footbath, perform phosphoric acid treatment and are carried to the spot.

 

○February 15, 2012 (Heisei 24)

[Kiriake]

Kiriake

We are going to abandoned kon da chio of basin.

 

[alley]

Alley

Footbath, the back are public toilet parts before hand. We are producing steel frame of customs shed now in factory.

 

January, 2012 (Heisei 24) 

○January 20, 2012 (Heisei 24)

[Kiriake]

State of piling-stones

Stone masonry advanced to 3 step eyes. We use stone from hometown called crenel (interval) stone.

 

[alley]

The public toilet situation to arrangeState of footbath

Construction to arrange went ahead through public toilet.

Plumbing completes place where there is break space with footbath.

 

○January 13, 2012 (Heisei 24)

[Kiriake]

Removal work of bridge which was on the waterway was finished and was fixed in retaining wall neatly.

State of existing bridge removal

Of wedge-shaped stone piled up, and advance began.

Form of stone is fixed by hand of craftsman one by one while confirming overlapped health with other stones and is piled up on the site.

State of piling-stonesState of piling-stones

[alley]

Public toilet is completed place. Plumbing advanced.

State of plumbing

 

○January 6, 2012 (Heisei 24)

[Kiriake]

Concrete casting of pit of public toilet under the ground was completed (the photograph left), and removal construction of bridge on waterway began, too (the photograph right).

State of Kiriake restroom basement pit concrete casting completionBridge removal construction

[alley]

Two big holes opened on site. We prepare public toilet into footbath, the depths toward you (as for the photograph as of the end of December).

The situation of site

 

 

December, 2011 (Heisei 23) 

○December 21, 2011 (Heisei 23)

[Kiriake]

The waterway side was lined with retaining walls, and basic, arranging completed restroom.

State of retaining wallState of basic public toilet, arranging

[alley]

Lump of concrete left on site was removed and was levelled the land.

Site that was levelled the land of


 

 

The Kikuchi pocket park start of construction

○November 29, 2011 (Heisei 23)

In November, 2011, Kikuchi pocket park finally started construction.

With Kiriake district, alley district, the territory is completed.

State of the territoryState of the territory

Kiriake

Alley

 

Design process

2008.10.27 project decision 

2008.12.12 town development strategy workshop "joins memory of town together in the future"

(we hold in "Kumamoto art police architecture exhibition 2008")

※We performed with inhabitants and, through making of "waifuno now and the bygone days map", let big picture which included flow of time for gusset rise and rediscovered now of Waifu and old good point. This was cooperation work to connect memory = inheritance with future design created from now on at the same level as town, and this result was utilized as hint to lay idea of pocket park design. 

The whole 2009.2.2 inhabitants briefing session (3 district inhabitants and administration, designer)

Briefing session in each 2009.4.2 - 7 district

2009.7.29 inhabitants briefing session (alley district inhabitants and administration, designer)

The whole 2009.9.2 inhabitants briefing session (3 district inhabitants and administration, designer)

2009.9 basic design completion

2010.2 conduct design completion (plan)

Holding of 2010.2.7 art police symposium in Kikuchi

The construction start of construction of 2011.11 Kiriake district, alley district

 

Completion Perth figure   

 

Kiriake completion Perth figureAlley completion Perth figure

Kiriake pocket park

Alley pocket park

※We made for design stage, and partial change is possible.

 

 

Comment from designer, Takao Shiotsuka

Takao Shiotsuka

Takao Shiotsuka/Takao Shiotsuka atelier

Kikuchi pocket park maintenance business began in October, 2008 and finished design after workshop and symposium with inhabitants in March, 2010. Afterwards, we start construction last year (2011) in November and push forward construction for completion of this March.


Kikuchi-shi center city area is town with close scale which former cityscape remains. We make point of walker network which by maintaining there some parks, surrounds machinakao on foot and are going to create flows of new people. It is two places that push forward construction and arranges hydrophilic functions such as footbath or waterway each and plans so that it is got close again as oasis of local resident as place of interchange, stay of people visiting.


In Kiriake (the drill end) park, water collects in the ground which became hollow with nature and creates primitive scenery that there was by public toilet bench shelter reminding of three basins and stone and rock.

While "bank" which we bend pipe and piled up forms footbath, public toilet, bench under the theme of a person's flow and interchange in alley park, it is guide of a person's movement and activity and describes design such as whirlpool in the whole site.

We are going to have as all link that you go round towns on foot, sense Kikuchi bodily.

 
Kikuchi city area pocket park aimed at creation of space of encounter aspect-like as oasis of local resident again as place of interchange, convection of person who came and was planned with main points of walker network.
Facility maintenance that there is characteristic that there is contact with culture of Kikuchi including hydrophilic functions such as footbath or waterway and natural <water> is expected.
 

We relate to this page
Inquiry

Department of Civil Engineering Architecture Division art police, UD group
Telephone: 096-333-2537
(ID: 1647)
※When PDF file is attached as materials, Adobe Acrobat(R) is necessary.
When you look at PDF documents, Adobe Reader is necessary. When you are not displayed definitely, please use the latest version.
Kumamoto prefectural government office   〒 862-8570  6-18-1, Suizenji, Chuo-ku, Kumamoto-shi, Kumamoto Tel: 096-383-1111 (main)
Copyright(C) 2015 Kumamoto Prefectural Government. All rights reserved.