Kumamoto
We are displayed with mode now at large-scale disaster.

Authorization (the fourth) of reconstruction contracts plan

The last update date:
 

About authorization (the fourth) of reconstruction contracts plan

○ About reconstruction contracts plan pertaining to group subsidy (for the third open call for participants), we authorized 43 groups (the number of the constitution 404 person) newly today. In this way, the number of the authorized groups became 417 groups (the number of the constitution 6,480 person) in total.

○ In addition, next reconstruction contracts plan certification application is going to start as the third open call for participants before this year. We will tell as soon as concrete schedule is fixed.

 

The authorized situation of reconstruction contracts plan pertaining to 1 group subsidy

Division

Application
The number of the groups

Authorization
The number of the groups

Reservation
The number of the groups

Withdrawal
The number of the groups

The first
Open call for participants

For the primary deadline
The July 22 deadline

113

109

0

4

For the second deadline
The August 26 deadline

131

125

0

6

The second
Open call for participants

For the primary deadline
The September 30 deadline

144

140 → 142
※Two cases are authorized this time

3 → 0
※Two authorization,
One withdrawal

1 → 2
※Among reservation
One withdrawal

For the second deadline
The October 26 deadline

48

41

5

2

The total

436

417

5

14

  ※95.6% of total authorization rates

  ※About five cases for reservation, we are going to consult with evaluation Committee of the middle of December again

 

[reference: at this time for authorization type of 43 groups]

 It is supply chain type type 1     0 groups (the number of the constitution    0 people)

 It is the economy, employment effect type type 2      0 groups (the number of the constitution    0 people)

 It is key industry accumulation type of area type 3    42 groups (the number of the constitution    398 people)

 It is sightseeing service accumulation type type 4       0 groups (the number of the constitution    0 people)

 It is mall type type 5          1 group (the number of the constitution    6 people)

 ※As for the list of groups of authorization, please see the next attached file this time.

  PDF List of authorized groups (the fourth) With new window(PDF: 163.4 kilobytes)

 

Plan of 2 future

 Friday, December 9, briefing session (I will inform ※ group representative separately) pertaining to 14th Wednesday subsidy grant application


We relate to this page
Inquiry

Company reconstruction aid room
Telephone: 096-213-7061
Email [email protected]
(ID: 17786)

We open with the other window Link having this mark opens with the other window

※When PDF file is attached as materials, Adobe Acrobat(R) is necessary.
When you look at PDF documents, Adobe Reader is necessary. When you are not displayed definitely, please use the latest version.
Kumamoto prefectural government office   〒 862-8570  6-18-1, Suizenji, Chuo-ku, Kumamoto-shi, Kumamoto Tel: 096-383-1111 (main)
Copyright(C) 2015 Kumamoto Prefectural Government. All rights reserved.