Kumamoto

Common specifications such as design duties

The last update date:
Department of Civil Engineering Civil Engineering Technical Management Division 
TEL: 096-333-2490 
FAX: 096-381-0570 
Email [email protected]
 

Common specifications such as design duties

■We are applied by contract after April 1, 2018.

   Authority of first edition  kyotsuhen (PDF: 216.3 kilobytes) We open with the other window
   The second river
   The third shore
   The fourth erosion control  Erosion control (PDF: 458.3 kilobytes) We open with the other window
   The fifth dam  Dam (PDF: 288.8 kilobytes) We open with the other window
   The sixth road  Road (PDF: 795.8 kilobytes) We open with the other window
   The seventh harbor

  Harbor (PDF: 55.2 kilobytes) We open with the other window

   The eighth sewer  The sewer (PDF: 64.6 kilobytes) We open with the other window
   The ninth telecommunications facility  Telecommunications facility (PDF: 63.8 kilobytes) We open with the other window
   Style (duties progress schedule)  PDF Style With new window(PDF: 16.5 kilobytes)

 

■We are applied after May 1, 2015 by contract until - March 31, 2018.

   Authority of first edition  PDF kyotsuhen With new window(PDF: 1.7 megabytes)
   The second river  PDF River With new window(PDF: 1.77 megabytes)
   The third shore  PDF The shore With new window(PDF: 822.5 kilobytes)
   The fourth erosion control  PDF Erosion control With new window(PDF: 528.6 kilobytes)
   The fifth dam  PDF Dam With new window(PDF: 2.64 megabytes)
   The sixth road  PDF Road With new window(PDF: 4.26 megabytes)
   The seventh harbor
  • PDF Harbor With new window(PDF: 77.2 kilobytes)
   The eighth sewer  PDF The sewer With new window(PDF: 86.5 kilobytes)
   The ninth telecommunications facility  PDF Telecommunications facility With new window(PDF: 85.8 kilobytes)
   Style (duties progress schedule)   PDF Style With new window(PDF: 16.5 kilobytes)

 

■We apply to contract until from May 1, 2014 to April 30, 2015.

   Authority of first edition         PDF PDF [PDF file/1.63MB]
   The second river         PDF PDF [PDF file/1.69MB]
   The third shore         PDF PDF [PDF file/821KB]
   The fourth erosion control         PDF PDF [PDF file/447KB]
   The fifth dam         PDF PDF [PDF file/2.4MB]
   The sixth road         PDF PDF [PDF file/4.14MB]
   The seventh harbor         PDF PDF [PDF file/78KB]
   The eighth sewer                  PDF PDF [PDF file/87KB]
     The ninth telecommunications facility         PDF Portable Document Format [PDF file/86KB]
   Style (duties progress schedule)    PDF Portable Document Format [17KB]

 

■We apply to contract until from January 5, 2009 to April 30, 2014.
   Cover, table of contents    PDF Portable Document Format [69KB]                 
   Authority of first edition    PDF Portable Document Format [274KB]
   The second river    PDF Portable Document Format [546KB]
   The third shore    PDF Portable Document Format [337KB]
   The fourth erosion control    PDF Portable Document Format [740KB]
   The fifth dam    PDF Portable Document Format [701KB]
   The sixth road    PDF Portable Document Format [720KB]
   The seventh harbor    PDF Portable Document Format [61KB]
   The eighth sewer                 PDF Portable Document Format [64KB]
   Style (duties progress schedule)    PDF Portable Document Format [17KB]

We relate to this page
Inquiry

Department of Civil Engineering Civil Engineering Technical Management Division
Telephone: 096-333-2490
Fax: 096-381-0570
Email [email protected]
(ID: 1856)

We open with the other window Link having this mark opens with the other window

※When PDF file is attached as materials, Adobe Acrobat(R) is necessary.
When you look at PDF documents, Adobe Reader is necessary. When you are not displayed definitely, please use the latest version.
Kumamoto prefectural government office   〒 862-8570  6-18-1, Suizenji, Chuo-ku, Kumamoto-shi, Kumamoto Tel: 096-383-1111 (main)
Copyright(C) 2015 Kumamoto Prefectural Government. All rights reserved.