Kumamoto
We are displayed with mode now at large-scale disaster.

About correspondence of Kumamoto management dam about heavy rain from July 5, 2018

The last update date:

 

About correspondence of Kumamoto management dam about heavy rain from July 5, 2018

 In the seasonal rain front heavy rain of from 5 to 8 on July in 2018, it is flood control by four dams (Ichifusa dam, Ishiuchi Dam, jotsuura dam, Rogi dam) among dams which the prefecture manages ※We performed this. It was effective in reducing water level of the downstream river by this flood control.

※You save a part of quantity of water to flow into dam at the time of flood into dam to prevent flood damage of the dam downstream with flood control, and to be reduced, and reduce quantity of water to drain into the downstream river


 



We relate to this page
Inquiry

Department of Civil Engineering Rivers Division
Telephone: 096-333-2506
Fax: 096-382-3277
Email [email protected]
(ID: 24347)
※When PDF file is attached as materials, Adobe Acrobat(R) is necessary.
When you look at PDF documents, Adobe Reader is necessary. When you are not displayed definitely, please use the latest version.
Kumamoto prefectural government office   〒 862-8570  6-18-1, Suizenji, Chuo-ku, Kumamoto-shi, Kumamoto Tel: 096-383-1111 (main)
Copyright(C) 2015 Kumamoto Prefectural Government. All rights reserved.