Kumamoto
We are displayed with mode now at large-scale disaster.

Periodical inspection of waste disposal and treatment facility

The last update date:
Department of Environment and Residential Life circulation society promotion section 
TEL: 096-333-2278 
FAX: 096-383-7680 
Email [email protected]
    •  

Revised Wastes Disposal and Public Cleaning Law of the enforcement requires periodical inspection of waste disposal and treatment facility (final action and destruction by fire) on April 1, 2011.

 

Purpose of examination for 1 system

 As a general rule, person who received setting permission of wastes disposal facility and industrial waste disposal facility will have to undergo an examination of the prefecture whether the facility concerned adapts to structure standard every less than five years three months (2-2 (one abolished), law Article 15 of law Article 8 2-2 (industrial waste)).
  ※As wastes disposal facility of the municipalities setting is excluded, we omit.

 When we established the facility concerned about waste disposal and treatment facility or we changed, inspection before use was required, but there was not system that prefectural governors confirmed regularly whether you adapted to requirements of permission and done technical standard after having received permission because update of the permission concerned was unnecessary. Therefore we prevented outbreak of trouble in living environment maintenance that the facility concerned caused with deterioration of waste disposal and treatment facility or enlarged and might not prevent.
 Therefore, about waste disposal and treatment facility of incineration facilities or final disposal site, person who received permission of setting decided to have to undergo an examination of prefectural governors regularly, and it was decided to have, and to plan improvement in trust of people for waste disposal and treatment facility.

 

Waste disposal and treatment facility that 2 should be examined

(1)Incineration facilities (industrial waste, one abolished)
(2)Final disposal site (industrial waste, one abolished)
(3)Molten facility of abolished asbestos or asbestos-containing industrial waste
(4)The resolution facility of abolished polychlorinated biphenyls or polychlorinated biphenyl processing thing or washing facility of polychlorinated biphenyl pollutant or polychlorinated biphenyl processing thing or separation facility
※Final disposal site of stopping waste disposal and treatment facility and waste which inning disposal terminated is included in the waste disposal and treatment facility concerned.

 

 

About flow of 3 periodical inspection

(1) Submission (4-2 of rule Article 4, 2 of style No. 20) of application
  Person who is going to be examined, please submit application which listed the following to the jurisdiction public health center beforehand.
 ○ Address, name, Name of Representative of facility, place of facility, type of facility, the permission date, permission number
(2) Contents (rule Article 4, 2 of rule Article 12, technical departmental order (final disposal site)) of inspection
 We inspect whether facility adapts to technical standard.
(3) Notice (4-4 of rule Article 4, 3 of style No. 20) of result
 We issue document which notifies the result if the prefecture gives a test.

※Inspection fee is free.

※We refuse periodical inspection, and interference, punitive clause (fine 300,000 yen or less, law Article 30 No. 3) for person whom we evaded are established.

 

Application documents of 4 periodical inspection

 Periodical inspection application (one abolished) (word: 48.5 kilobytes) We open with the other window


 

 

Documents which you should prepare for before examination for 5

<stable disposal ground>

(1) Drawing which structure of facility understands
(2) Maintenance blotter (7-2 of enforcement regulations Article 12) for three years
 Oh, each monthly type that we disposed of and amount
 The date when performed i retaining wall check and, as a result
 The date when measured u zanyo*ritsuyoryo and, as a result
 Oh, it is the visual study implementation number of times of import industrial waste
 Collection place, the date and time, test result of o examination of water
(3) Manifesto
(4) Repair, documents which the contents understand when we repair such as facilities
(5) Documents (identifications of class completion) which prove that we have full name of technical manager prescribed in method of waste disposal Article 21 and qualification

<management type disposal ground>

(1) Drawing which structure of facility understands
(2) Maintenance blotter (7-2 of enforcement regulations Article 12) for three years
 Oh, each monthly type that we disposed of and amount
 The date when performed i retaining wall check and, as a result
 The date when checked u *suiko and, as a result
 Oh, it is collection place, the date and time, test result of examination of water
 The date when checked o adjustment reservoir and, as a result
 The date when checked mosquito liquid processing equipment which leached out and, as a result
 The date when measured ki rest inning capacity and, as a result
(3) Manifesto
(4) Repair, documents which the contents understand when we repair such as facilities
(5) Documents (identifications of class completion) which prove that we have full name of technical manager prescribed in method of waste disposal Article 21 and qualification

<incinerator>

(1) Drawing which structure of incineration facilities understands
(2) Maintenance blotter (7-2 of enforcement regulations Article 12) for three years
 Oh, each monthly type that we disposed of and amount
 The date when i "combustion chamber gas temperature, dust collection machine inflow gas temperature, position, result of a measurement that we measured of carbon monoxide concentration" and the result were provided
 The date when it was eliminated of we increase cormorant times, pitching a camp
 Oh, the date when position, result of a measurement that we measured of "dioxin, soot and dust, hydrogen chloride, sulfur oxide, nitrogen oxide" and the result were provided
(3) Manifesto
(4) Repair, documents which the contents understand when we repair such as facilities
(5) Documents (identifications of class completion) which prove that we have full name of technical manager prescribed in method of waste disposal Article 21 and qualification

 

 

Hit notice matter pertaining to conduct of 6 periodical inspection

 We carry out periodical inspection during operation. It is not necessary to stop expressly. In addition, about facility where the end of stop average and the inning report is submitted to of operation and final disposal site of facility dig, and do not demand raising. We carry out inspection such as examination for documents, examination of hearing and viewing in reference to periodical inspection vote as far as it is confirmable.
 By examination for documents and hearing, we confirm the structure standard conformity situation with drawings of structure of facility or facilities contents and confirm the local situation by viewing with it is inspection such as viewing. 
 

7 periodical inspection guidelines (Ministry of the Environment)




 


 

 





 

We relate to this page
Inquiry

Department of Environment and Residential Life circulation society promotion section
Telephone: 096-333-2278
Fax: 096-383-7680
Email [email protected]
(ID: 27939)
※When PDF file is attached as materials, Adobe Acrobat(R) is necessary.
When you look at PDF documents, Adobe Reader is necessary. When you are not displayed definitely, please use the latest version.
Kumamoto prefectural government office   〒 862-8570  6-18-1, Suizenji, Chuo-ku, Kumamoto-shi, Kumamoto Tel: 096-383-1111 (main)
Copyright(C) 2015 Kumamoto Prefectural Government. All rights reserved.