Kumamoto
We are displayed with mode now at large-scale disaster.

About revisions such as public works standard multiplication workbooks

The last update date:
Department of Civil Engineering Civil Engineering Technical Management Division 
TEL: 096-333-2490 
FAX: 096-381-0570 
Email [email protected]

2019 (Raiwa 1)                                                    

About revisions such as public works standard multiplication workbooks

 About this, appropriate target price sets the Ministry of Land, Infrastructure, Transport and Tourism in conformity with basic principles of aratameseihinkakuho
Based on the latest results, it is multiplied public works and duties on April 1, 2019 (Raiwa 1) to be able to do it

We revised standard.

 Therefore follow country, and, in this prefectural Department of Civil Engineering, is as follows, domokukojihyo
As we decided to revise associate multiplication workbooks, we will tell.
                Note
1. Workbooks which are targeted for revision
(1) Public works standard multiplication workbook
(2) Harbor contract construction multiplication standard
(3) Design, investigation and surveying duties multiplication standard and hyojunhokakari

2. Application day
 We apply from the enforcement inquiry approval minute after August 1, 2019 (Raiwa 1).
3. Others
 For details, I would like reading in Kumamoto prefectural government office information plazas.

 

2019 (Heisei 31)                                                    

About some revisions of public works standard multiplication workbook

 So that, about this, appropriate target price sets the Ministry of Land, Infrastructure, Transport and Tourism in conformity with basic principles of aratameseihinkakuho
Based on the latest results, we revise multiplication standard of public works and duties on April 1, 2019 (Heisei 31).

 Therefore it follows country and, in this prefectural Department of Civil Engineering, revises public works standard multiplication workbook as follows
As it was decided, we will tell.
                Note
1. Revision summary

  (1) Public works standard multiplication workbook

         ・Revision of the spot administrative expense rate
          Based on increase of the spot expense (outside order expenses) required for new technology introduction, we revise the spot administrative expense

2. Application day

    We apply from the enforcement inquiry approval minute after April 1, 2019 (Heisei 31).

3. Others

   For details, I would like reading in Kumamoto prefectural government office information plazas.

     About other contents, we are going to revise in August.

 

 

 

2018                                                    

About revisions such as public works standard multiplication workbooks

 About this, appropriate target price sets the Ministry of Land, Infrastructure, Transport and Tourism in conformity with basic principles of aratameseihinkakuho
To be able to do it;, based on the latest results, is aratame of multiplication standard of public works and duties on April 1, 2018
We performed constant o.

 Therefore follow country, and, in this prefectural Department of Civil Engineering, is as follows, domokukojihyo
As we decided to revise associate multiplication workbooks, we will tell.
                Note
1. Workbooks which are targeted for revision
(1) Public works standard multiplication workbook
(2) Harbor contract construction multiplication standard
(3) Design, investigation and surveying duties multiplication standard and hyojunhokakari
(4) As for the construction machines, it is rental fee calculation list
2. Application day
We apply from the enforcement inquiry approval minute after October 1, 2018.
3. Others
For details, I would like reading in Kumamoto prefectural government office information plazas. (after October 1)

 

 

2018                                                    

About some revisions such as public works standard multiplication workbooks

  So that appropriate target price sets in conformity with basic principles of aratameseihinkakuho in Kumamoto Department of Civil Engineering; based on the latest results revision of multiplication standard of public works and duties

We decide to perform. Therefore, we decide to review public works standard multiplication workbook, design, investigation and surveying duties multiplication standard and hyojunhokakari as follows and are better

We will tell about tanode.

                                                                          Note

1. Revision summary

  (1) Public works standard multiplication workbook

           ・Revisions of rate such as general administrative cost

          We reflect the latest actual situation of the very head office expense for research and development expenses, and general administrative cost revises rate.

     ・Derogation of market unit price

      Because collection of data that good business was performed becomes difficult, about market unit price 3 mechanic class shown below, it depends on market unit price method

      We abolish unit price setting and shift to "public works standard unit price" that Investigation Committee for construction prices and Investigation Committee for economy set based on fact-finding.

                  (1)Concrete block product mechanic (2) bridge painter (3) structure captive me mechanic

  (2) Design, investigation and surveying duties multiplication standard and hyojunhokakari

     Review of multiplication condition accompanied with the abolition of market unit price in geological survey duties

     ・Bowling is machine-related: The division of footing standard

      We divide flatland scaffold (there is no height division) for each height division (0.3m or less, more than 0.3m).

     ・Small transportation in the spot: Subdivision of standard

      We subdivide transportation distance of special equipment car transportation (crawler) and monorail transportation each.

2. Application day

    We apply from the enforcement inquiry approval minute after April 1, 2018.

3. Others

  For details, I would like reading in Kumamoto prefectural government office information plazas. (it can be browsed after April 2)

     About other contents, we are going to revise in October according to usual.

 

2017                                                    

About some revisions such as public works standard multiplication workbooks

  We decide to revise multiplication standard of public works and duties based on the latest results so that appropriate target price sets in conformity with basic principles of aratameseihinkakuho in Kumamoto Department of Civil Engineering. Therefore, we will tell as we decided to review traffic regulation revision of public works standard multiplication workbook as follows.

                                                                          Note

1. Revised summary

   Public works standard multiplication workbook

         ・Review of traffic regulation revision

        About revision when it regulates general traffic, we found division by traffic and review the past addition revision for multiplier revision.

   ・Review of expense about the spot environment improvement

     The latest results of recording item where we change name of image enhancement expense to the spot environment improvement costs to accord with the actual situation, and woman locker room and heat stroke take measures against

        We review ratio of necessary expenses to gross revenue on the basis of this.

2. Application day

    We are applied by the enforcement inquiry to draft after April 1, 2017.

3. Others

  For details, I would like reading in Kumamoto prefectural government office information plazas.

     We are going to revise in October according to hokakari rinitsuiteha, usual of public works standard multiplication workbook.

     

 

 

We relate to this page
Inquiry

Department of Civil Engineering Civil Engineering Technical Management Division
Telephone: 096-333-2490
Fax: 096-381-0570
Email [email protected]
(ID: 6925)
※When PDF file is attached as materials, Adobe Acrobat(R) is necessary.
When you look at PDF documents, Adobe Reader is necessary. When you are not displayed definitely, please use the latest version.
Kumamoto prefectural government office   〒 862-8570  6-18-1, Suizenji, Chuo-ku, Kumamoto-shi, Kumamoto Tel: 096-383-1111 (main)
Copyright(C) 2015 Kumamoto Prefectural Government. All rights reserved.